Verkkosääntöjen viranomaispäätökset
Täältä löydät viimeisimmät Fingridin julkaisemat verkkosääntöjen päätökset. Osa aineistosta englanniksi.
Pvm |
Päätöksen nimi |
Verkkosääntö |
Päätökset ja liitteet |
---|---|---|---|
21.11. | Päätös Fingrid Oyj:n ehdotukseen Baltic kapasiteetin laskenta-alueen yhteisestä kapasiteetin laskentamenetelmästä | Guideline on capacity allocation and congestion management | |
25.9. | ACER Decision No 12/2024 on the amendment of the methodology for calculating scheduled exchanges resulting from single day-ahead coupling | Guideline on capacity allocation and congestion management | |
5.7. | ACER Decision No 09/2024 on the second amendment to the methodology for pricing balancing energy and cross-zonal capacity used for the exchange of balancing energy or operating the imbalance netting process | Guideline on electricity balancing | |
5.7. | ACER Decision No 08/2024 on the second amendment to the implementation framework for a European platform for the exchange of balancing energy from frequency restoration reserves with automatic activation | Guideline on electricity balancing |
Päätös
|
13.5. | ACER Decision No 07/2024 on the amendment of the methodology for coordinating operational security analysis | Guideline on electricity transmission system operation | |
1.2. | Päätös Fingrid Oyj:n ehdotukseen pätötehon muutosnopeusrajoituksista | Guideline on electricity transmission system operation | |
29.1. | Päätös Fingrid Oyj:n toimittamaan ehdotukseen alueiden välisen kapasiteetin laskemiseksi tasehallinnan aikavälillä tasesähkön vaihtoa tai epätasapainon netotusprosessin toteuttamista varten Baltic kapasiteetin laskenta-alueella | Guideline on electricity balancing |
Pvm |
Päätöksen nimi |
Verkkosääntö |
Päätökset ja liitteet |
---|---|---|---|
21.12. | ACER Decision No 16/2023 on the TSOs' proposal for amendment of the congestion income distribution methodology | Guideline on capacity allocation and congestion management | |
23.10. | Päätös Fingrid Oyj:n toimittamaan muutosehdotukseen Nordic kapasiteetinlaskenta-alueen siirtoverkonhaltijoiden yhteisestä markkinapohjaista jakamisprosessia koskevasta menetelmästä | Guideline on electricity balancing | |
16.10. | Päätös Fingrid Oyj:n toimittamaan ehdotukseen alueiden välisen kapasiteetin laskemiseksi tasehallinnan aikavälillä tasesähkön vaihtoa tai epätasapainon netotusprosessin toteuttamista varten Nordic kapasiteetin laskenta-alueella | Guideline on electricity balancing | |
29.9. | Päätös Fingrid Oyj:n toimittamaan ehdotukseen koskien tarjousalueiden välisen siirtokapasiteetin markkinapohjaista jakamisprosessia Baltian kapasiteetinlaskenta-alueella | Guideline on electricity balancing | |
19.7. | ACER Decision No 11/2023 on the TSOs' proposal for the harmonised cross-zonal capacity allocation methodology | Guideline on electricity balancing | |
30.5. | ACER Decision No 10/2023 on the amendment of the methodology for calculating scheduled exchanges resulting from single day-ahead coupling | Guideline on capacity allocation and congestion management | |
6.4. | Päätös Fingrid Oyj:n ehdotukseen taajuuden palautusreservien mitoitussäännöistä | SOGL | |
31.3. | ACER Decision 8-2023 on the amendment to the determination of capacity calculation regions | Guideline on capacity allocation and congestion management | |
22.3. | Päätös Fingrid Oyj:n ehdotukseen taajuuden vakautusreservien lisäominaisuuksista | SOGL | |
22.3. | Päätös Fingrid Oyj:n ehdotukseen taajuuden vakautusreservien mitoitussäännöistä | SOGL | |
22.3. | ACER Decision 07-2023 on the TSOs’ proposal for amendments to the methodology for sharing Firmness and Remuneration Costs (FRC) of long-term transmission rights | Guideline on forward capacity allocation | |
22.3. | ACER Decision 06-2023 on the TSOs’ proposal for amendments to the Congestion Income Distribution (CID) methodology | Guideline on forward capacity allocation | |
17.2. | Päätös reservitoimittajien ja tasevastaavien varttitaseen ehtomuutoksista | EBGL |
Pvm |
Päätöksen nimi |
Verkkosääntö |
Päätökset ja liitteet |
---|---|---|---|
30.9. | ACER Decision 16-2022 on the Amendment to the Implementation framework for a European platform for the imbalance netting process | Guideline on electricity balancing | |
30.9. | ACER Decision 15-2022 on the Amendment of the aFRR-Platfom Implementation Framework (automatic activation) | Guideline on electricity balancing | |
30.9. | ACER Decision 14-2022 on the Amendment of the mFRR-Platfom Implementation Framework (manual activation) | Guideline on electricity balancing | |
20.9. | Päätös Suomen ja Viron rajaa koskevasta kahdenvälisestä osittamismenetelmästä | Guideline on forward capacity allocation | |
20.9. | Päätös pitkän aikavälin siirto-oikeuksien alueellisista korvaussäännöistä Baltic kapasiteetin laskenta-alueella | Guideline on forward capacity allocation | |
20.9. | Päätös pitkän aikavälin siirto-oikeuksien alueellisesta suunnittelusta Baltic kapasiteetin laskenta-alueella | Guideline on forward capacity allocation | |
18.7. | ACER Decision 10-2022 on the TSOs’ proposal for amendment to the congestion income distribution methodology | Guideline on forward capacity allocation | |
18.7. | ACER Decision 09-2022 on the TSOs’ proposal for amendment to the requirements of the Single Allocation Platform and to the methodology for sharing costs of establishing, developing and operating the Single Allocation Platform | Guideline on forward capacity allocation | |
25.2. | ACER Decision 03-2022 on the Amendment to the Methodology for Pricing Balancing Energy | Guideline on electricity balancing | |
3.2. | Päätös Fingrid Oyj:n ehdotukseen pätötehon muutosnopeusrajoituksista pohjoismaisella synkronialueella | Guideline on electricity transmission system operation |
Pvm |
Päätöksen nimi |
Verkkosääntö |
Päätökset ja liitteet |
---|---|---|---|
17.12. | ACER Decision 16-2021 on the Congestion Income Distribution Methodology | Guideline on capacity allocation and congestion management | |
29.11. | ACER Decision 15/2021 on the TSOs’ proposal for amendment of the harmonised allocation rules for long-term transmission rights | Guideline on forward capacity allocation |
|
8.10. | Päätös Fingrid Oyjn ehdotukseen taajuuden vakautusreservien lyhimmästä aktivointiajasta | Guideline on electricity transmission system operation | |
4.10. | ACER Decision 12/2021 on sharing costs incurred to ensure firmness and remuneration of long-term transmission rights | Guideline on forward capacity allocation |
|
13.8. | ACER Decision 10/2021 on the market-based allocation process of cross-zonal capacity for the exchange of balancing capacity for the Baltic CCR | Guideline on electricity balancing | |
14.6. | ACER Decision 07-2021 on the Amendment of the Methodology for Coordinating Operational Security Analysis | Guideline on electricity transmission system operation (SO GL) |
|
7.6. | Päätös koskien suojausmahdollisuuksia FI-EE -rajalla. | FCA Guideline 30 artikla | |
7.5. | Decision on the determination of capacity calculation regions (CCR). | CCR | |
16.3. |
Päätös poikkeamisluvan myöntämisestä 15 minuutin taseselvitysjakson käyttöönotolle |
EBGL |
Pvm |
Päätöksen nimi |
Verkkosääntö |
Päätökset ja liitteet |
---|---|---|---|
23.12. | ACER Decision 38-20 on the methodology for the use of congestion income |
ACER Decision 38-20 on the methodology for the use of congestion income |
|
22.12. | Corrigendum to ACER Decision 25-2020 of 23 October 2020 on sharing costs incurred to ensure firmness and remuneration of long-term transmission rights | Guideline on forward capacity allocation |
Rectified ACER Decision 25-20 on sharing costs incurred to ensure firmness and remuneration of long-term transmission rights |
21.12. | Manuaalisen taajuudenpalautusreservin palveluehtojen tarjouskokoa koskeva muutos | ||
9.12. | Päätös Fingrid Oyj:n ehdotukseen pätötehon muutosnopeusrajoituksista pohjoismaisella synkronialueella | Guideline on electricity transmission system operation |
|
30.11. | Päätös Fingrid Oyj:n ehdotukseen taajuuden vakautusreservien lisäominaisuuksiksi | Guideline on electricity transmission system operation |
|
24.11. | ACER Decision 29-20 on the methodology and assumptions that are to be used in the bidding zone review process and for the alternative bidding zone configurations to be considered |
ACER Decision 29-20 on the BZR |
|
23.10. | ACER Decision 25-20 on sharing costs incurred to ensure firmness and remuneration of long-term transmission rights | Guideline on forward capacity allocation |
ACER Decision 25-20 on sharing costs incurred to ensure firmness and remuneration of long-term transmission rights |
16.10. | Päätös Fingrid Oyj:n ehdotukseen Nordic kapasiteetin laskenta-alueen yhteisen kapasiteetin laskentamenetelmän muuttamisesta |
Guideline on Capacity Allocation and Congestion Management |
|
12.10. | Päätös Fingrid Oyj:n toimittamaan ehdotukseen käyttövarmuuden koordinointia koskevasta menetelmästä Baltic kapasiteetin laskenta-alueella. | Guideline on electricity transmission system operation |
|
5.10. | Päätös Fingrid Oyj:n toimittamaan ehdotukseen käyttövarmuuden koordinointia koskevasta menetelmästä Nordic kapasiteetin laskenta-alueella | Guideline on electricity transmission system operation |
|
5.8. | ACER Decision 22-2020 on the market-based allocation process of cross-zonal capacity for the exchange of balancing capacity for the Nordic CCR (A41) | Guideline on electricity balancing |
ACER Decision 22-2020 on the market-based allocation process of cross-zonal capacity for the exchange of balancing capacity for the Nordic CCR (A41) |
5.8. | ACER Decision 21-2020 on the application of the Nordic CCR market-based allocation process for the Nordic LFC Block (A38) | Guideline on electricity balancing |
ACER Decision 21-2020 on the application of the Nordic CCR market-based allocation process for the Nordic LFC Block (A38) |
5.8. | ACER Decision 20-2020 on the exemption to the obligation to allow transfer of aFRR balancing capacity for the Nordic LFC Block (A34) | Guideline on electricity balancing |
ACER Decision 20-2020 on the exemption to the obligation to allow transfer of aFRR balancing capacity for the Nordic LFC Block (A34) |
5.8. | ACER Decision 19-2020 on the common and harmonised rules and processes for procurement and exchange of aFRR balancing capacity for the Nordic LFC Block (A33) | Guideline on electricity balancing |
ACER Decision 19-2020 on the common and harmonised rules and processes for procurement and exchange of aFRR balancing capacity for the Nordic LFC Block (A33) |
15.7. | ACER Decision 18-2020 on the harmonisation of the main features of imbalance settlement (ISHP) | Guideline on electricity balancing |
ACER Decision 18-2020 on the harmonisation of the main features of imbalance settlement (ISHP) |
15.7. | ACER Decision 17-2020 on the common settlement rules applicable to all intended exchanges of energy (SP) | Guideline on electricity balancing |
ACER Decision 17-2020 on the common settlement rules applicable to all intended exchanges of energy (SP) |
15.7. | ACER Decision 16-2020 on the methodology for classifying the activation purposes of balancing energy bids (APP) | Guideline on electricity balancing |
ACER Decision 16-2020 on the methodology for classifying the activation purposes of balancing energy bids (APP) |
24.6. | ACER Decision 13-2020 on Implementation framework for imbalance netting | Guideline on electricity balancing |
ACER Decision 13-2020 on Implementation framework for imbalance netting |
17.6. | ACER Decision 12-2020 on a co-optimised allocation process of cross-zonal capacity | Guideline on electricity balancing |
ACER Decision 12-2020 on a co-optimised allocation process of cross-zonal capacity |
17.6. | ACER Decision 11-2020 on standard products for balancing capacity | Guideline on electricity balancing |
ACER Decision 11-2020 on standard products for balancing capacity |
26.5. | Päätös ehdotukseen taajuuden vakautusprosessista ja tehon muutosnopeusrajoituksista aiheutuvista energianvaihtoihin sovellettavista selvitysäännöistä | Guideline on electricity balancing | Päätös aiheesta |
17.4. | Päätös Fingrid Oyj:n toimittamaan ehdotukseen yhteisistä selvityssäännöistä, joita sovelletaan suunniteltuihin energian vaihtoihin sekä yhteisistä selvityssäännöistä, joita sovelletaan kaikkiin suunnittelemattomiin energian vaihtoihin synkronialueella | Guideline on electricity balancing | Päätös aiheesta |
24.1. |
ACER Decision No 03-2020 on the Implementation framework for a European platform for the exchange of balancing energy from frequency restoration reserves with manual activation |
Guideline on electricity balancing |
ACER Decision 03-2020 on the Implementation framework for mFRR Platform |
24.1. |
ACER Decision No 02-2020 on the Implementation framework for aFRR Platform |
Guideline on electricity balancing |
Letter to TSOs - aFRR |
24.1. |
ACER Decision No 01-2020 on the Methodology for pricing balancing energy |
Guideline on electricity balancing |
Letter to TSOs - PP |
Pvm |
Päätöksen nimi |
Verkkosääntö |
Päätökset ja liitteet |
---|---|---|---|
30.10. | ACER:n päätös Nordic kapasiteetinlaskenta-alueen pitkän aikavälin kapasiteetinlaskentamenetelmästä | Guideline on forward capacity allocation |
ACER Decision 16-2019 on the Nordic CCR TSOs proposal for LT CCM |
25.10. |
Päätös Fingridin ehdotukseen Nordic-kapasiteetin laskenta-alueen yhteisestä kapasiteetin laskentamenetelmästä | Guideline on Capacity Allocation and Congestion Management |
Päätös aiheesta |
19.8. |
Tasehallintaa koskevien ehtojen ja edellytysten vahvistuspäätös |
Guideline on electricity balancing |
|
11.7. |
Päätös - Rajat taajuuden palautusreservien vaihdon ja jakamisen määrälle synkronialueiden välillä |
Guideline on electricity transmission system operation |
|
10.7. |
Päätös - Pätötehon muutosnopeusrajoitukset |
Guideline on electricity transmission system operation |
|
10.7. | Päätös - Taajuuden palautusreservien mitoitussäännöt | Guideline on electricity transmission system operation | Päätös aiheesta |
10.7. |
Päätös - Taajuuden palautuksen säätövirheen pienentämiseen tähtäävä koordinointi |
Guideline on electricity transmission system operation | Päätös aiheesta |
10.7. |
Päätös - Pätötehon muutosnopeusrajoitukset |
Guideline on electricity transmission system operation |
|
18.6. | Päätös Fingrid Oyj:n ehdotukseen merkittävistä verkonkäyttäjistä ja toimenpiteistä, jotka merkittävien verkonkäyttäjien on toteutettava | Network code on electricity emergency and restoration | Päätös aiheesta |
11.6. |
Päätös Fingridin ehdotukseen käytönpalautuspalvelujen tarjoajille asetettavista ehdoista ja edellytyksistä |
Network code on electricity emergency and restoration |
|
11.6. |
Päätös Fingridin ehdotukseen järjestelmän varautumispalvelun tarjoajille asetetuista ehdoista ja edellytyksistä |
Network code on electricity emergency and restoration |
|
11.6. |
Päätös Fingrid Oyj:n ehdotukseen markkinatoimintojen tilapäistä keskeyttämistä koskevista säännöistä |
Network code on electricity emergency and restoration |
Päätös aiheesta
|
11.6. | Päätös Fingridin ehdotukseen ajojärjestyksen uudelleenmäärittelyn ja vastakaupan kustannustenjakomenetelmästä Baltic-kapasiteetin laskenta-alueella | Guideline on Capacity Allocation and Congestion Management | Päätös aiheesta |
16.4. |
Päätös Fingridin ehdotukseen kustannushyötyanalyysissa käytettävistä oletuksista ja menetelmästä |
Guideline on electricity transmission system operation |
|
1.4. |
ACER Decision 04-2019 on electricity TSOs proposal for amendments of CCRs |
Guideline on Capacity Allocation and Congestion Management |
ACER Decision 04-2019 on electricity TSOs proposal for amendments of CCRs |
14.3. |
Päätös Fingridin ehdotukseen taajuuden vakautusreserveille tilapäisesti sovellettavasta pienimmästä aktivointiajasta |
Guideline on electricity transmission system operation |
|
14.3. |
Yhteen kytketyistä päivänsisäisistä markkinoista seuraavien suunniteltujen siirtojen laskentamenetelmä |
Guideline on Capacity Allocation and Congestion Management |
Päätös aiheesta
|
14.3. |
Fingrid Oyj:n käyttötoiminnan tiedonvaihdon laajuus |
Guideline on electricity transmission system operation |
|
14.3. |
Päätös Fingrid Oyj:n ehdotukseen taajuuden vakautusreservien mitoitussäännöiksi |
Guideline on electricity transmission system operation |
|
14.3. |
Päätös Fingrid Oyj:n ehdotukseen taajuuden laadun määritys ja tavoiteparametreiksi |
Guideline on electricity transmission system operation |
|
14.3. |
Päätös Fingrid Oyj:n ehdotukseen taajuuden vakautusreservien vaihdosta synkronialueen siirtoverkonhaltijoiden kesken |
Guideline on electricity transmission system operation |
|
14.3. |
Päätös Fingrid Oyj:n ehdotukseen taajuuden vakautusreservien lisäominaisuuksiksi |
Guideline on electricity transmission system operation |
|
14.2. |
Energiaviraston päätös yhteen kytketyistä vuorokausimarkkinoista seuraavien suunniteltujen siirtojen laskentamenetelmästä |
Guideline on Capacity Allocation and Congestion Management |
|
24.1. |
ACER:n päätös rajasiirtokapasiteetin hinnoittelumenetelmästä päivänsisäisillä markkinoilla |
Guideline on Capacity Allocation and Congestion Management |
ACER:n päätös aiheesta |
18.1. |
Päätös Fingrid Oyj:n ehdotukseen yhteisistä tiedonvaihdon vaatimuksista, rooleista ja vastuista (KORRR) |
Guideline on electricity transmission system operation |
|
18.1. |
Päätös Fingrid Oyj:n toimittamaan ehdotukseen koordinoitua ajojärjestyksen uudelleenmäärittelyä ja vastakauppaa |
Guideline on Capacity Allocation and Congestion Management |
|
14.1. |
Päätös Fingrid Oyj:n toimittamaan ehdotukseen koordinoitua ajojärjestyksen uudelleenmäärittelyä ja vastakauppaa |
Guideline on Capacity Allocation and Congestion Management |
|
14.1. |
Päätös Fingrid Oyj:n toimittamaan ehdotukseen ajojärjestyksen uudelleenmäärittelyn ja vastakaupan kustannustenjakomenetelmästä Nordic kapasiteetin laskenta-alueella |
Guideline on Capacity Allocation and Congestion Management |
Pvm |
Päätöksen nimi |
Verkkosääntö |
Päätökset ja liitteet |
---|---|---|---|
21.12. | Energiaviraston päätös useaa sähkömarkkinaoperaattoria koskevista järjestelyistä tarjousalueella |
Guideline on Capacity Allocation and Congestion Management |
Päätös aiheesta |
23.10. | Energiaviraston päätös Fingrid Oyj:n ehdotukseen Baltic-kapasiteetinlaskenta-alueen yhteisestä kapasiteetin laskentamenetelmästä | Guideline on Capacity Allocation and Congestion Management | Päätös aiheesta |
21.9. | Energiaviraston päätös Fingrid Oyj:n ehdotukseen yhteisten verkkomallien menetelmistä | Guideline on electricity transmission system operation | Päätös aiheesta |
10.9. | Energiaviraston päätös taajuudensäätöblokkien määrittelystä | Guideline on electricity transmission system operation | Päätös aiheesta |
12.7. | Päätös Fingrid Oyj:n ehdotukseen Nordic kapasiteetin laskenta-alueen yhteisestä kapasiteetin laskentamenetelmästä | Guideline on Capacity Allocation and Congestion Management | Päätös aiheesta |
12.7. | Päätös Fingrid Oyj:n toimittamaan ehdotukseen yhteistä verkkomallia koskevasta menetelmästä |
Guideline on Forward Capacity Allocation |
Päätös aiheesta |
24.4. | ACER Decision 04-2018 on all transmission system operators' proposal for intraday cross-zonal gate opening and intradray cross-zonal gate closure times | Guideline on Capacity Allocation and Congestion Management |
ACER Decision |
29.3. | Varamenettelyt kapasiteetin laskenta-alueelle Baltic | Guideline on Capacity Allocation and Congestion Management | Päätös aiheesta |
16.3. | Varamenettelyt kapasiteetin laskenta-alueelle Nordic | Guideline on Capacity Allocation and Congestion Management | Päätös aiheesta |
Pvm |
Päätöksen nimi |
Verkkosääntö |
Päätökset ja liitteet |
---|---|---|---|
14.12. | ACERin päätös pullonkaulatulojen jakamista koskevasta menetelmästä | Guideline on Capacity Allocation and Congestion Management | Päätös aiheesta Päätöksen liite |
12.12. | Päätös tuotanto- ja kulutustietojen toimitusmenetelmästä | Guideline on forward capacity allocation, Guideline on Capacity Allocation and Congestion Management | Päätös aiheesta |
29.5. | Vuorokausimarkkinoiden sitovan kapasiteetin ilmoittamisen takarajaa koskeva päätös | Guideline on Capacity Allocation and Congestion Management | Päätös aiheesta |
10.5. | Päätös Fingrid Oyj:n ehdottamasta yhteisestä verkkomallia koskevasta menetelmästä | Guideline on Capacity Allocation and Congestion Management | Päätös aiheesta |
10.4. | Useampaa nimettyä sähkömarkkinaoperaattoria koskevat järjestelyt tarjousalueella ja hyväksyttäväksi lähetetty ehdotus | Guideline on Capacity Allocation and Congestion Management | |
6.4. | Päätös siirto-oikeuksien käyttöönotosta ja suojausmahdollisuuksien varmistamisesta Suomen tarjousalueen rajoilla | Guideline on forward capacity allocation | Päätös aiheesta
Päätöksen liite 1 |
10.1. | Päätös Fingrid Oyj:n ehdotukseen tuotanto- ja kulutustietojen toimitusmenetelmistä | Guideline on Capacity Allocation and Congestion Management | Päätös aiheesta |